Get Prepared with fully updated Microsoft 70-467 Real Exam Questions and Accurate Answers for 70-467 Exam Dumps. Braindump2go IT experts review the 70-467 newly added qustions and suggest Correct Microsoft 70-467 Exam Questions Answers in Real Time. 100% Pass easily!

Vendor: Microsoft
Exam Code: 70-467
Exam Name: Designing Business Intelligence Solutions with Microsoft SQL Server 2012 Exam

11022

QUESTION 151
You have an application that uses a view to access data from multiple tables.
You need to ensure that you can insert rows into the underlying tables by using the view.
What should you do?

A.    Define the view by using the SCHEMABINDING option.
B.    Define the view by using the CHECK option.
C.    Create an INSTEAD OF trigger on the view.
D.    Materialize the view.

Answer: C

QUESTION 152
A company maintains separate environments for development, test, and production.
The company uses the project deployment model for SQL Server Integration Services (SSIS) deployments.
You create an SSIS project to perform a daily refresh of the data warehouse and data models. The project has five packages.
You need to configure the project to ensure that the development, test, and production teams can run each package without manually adding server-specific information.
Which program should you use? To answer, select the appropriate program in the answer area.

wpsABCA.tmp_thumb

Answer:

wpsC489.tmp_thumb

QUESTION 153
You are developing packages in a SQL Server Integration Services (SSIS) project to load a data warehouse.
You are designing a method for configuring the packages’ connections when deployed to a production SSIS catalog.
All packages load data from two source databases.
Two packages also load data from a third source database.
Another SSIS project will use the same connections.
You need to meet the requirements.
To answer, drag the appropriate term or terms to the correct location or locations in the answer area. (Each term may be used once, more than once, or not at all.)

wpsDB45.tmp_thumb

Answer:

wpsF432.tmp_thumb

QUESTION 154
A SQL Server Analysis Services (SSAS) cube named Sales includes a dimension named Date that defines a hierarchy named Calendar.
The Calendar hierarchy consists of Year, Quarter, and Month levels.
The Type properties of the Date dimension and its attributes are appropriately configured to mark the dimension as a time dimension.
You are creating a Multidimensional Expressions (MDX) query that will return sales for each month of 2011 and a three-month moving average of sales (labeled 3MMA), as shown in the following diagram.

wpsC45.tmp_thumb2

You need to complete the MDX query.
Which set expression should you use? To answer, drag the appropriate expression to the answer area.

wps329B.tmp_thumb

Answer:

wps46D7.tmp_thumb

QUESTION 155
You are developing a SQL Server Analysis Services (SSAS) cube.
A dimension named Customer is based on the DimCustomer table.
A subset of the data source view is shown in the following graphic.

wps5D83.tmp_thumb3

You need to relate the Customer dimension to the AccountBalance measure group.
Which relationship type should you choose? To answer, select the appropriate option from the drop-down list in the dialog box.

wps9102.tmp_thumb

Answr:

wpsB44C.tmp4_thumb

QUESTION 156
The IT department is currently upgrading all SQL Server Integration Services (SSIS) packages to SSIS 2012.
The final version of a complex SSIS 2005 package has been overwritten.
Four prior versions of the package exist.
Each of the prior versions contains a different part of the final solution.
You have backups of all associated project files.
You need to create an updated package as quickly and accurately as possible.
What should you do? (More than one answer choice may achieve the goal. Select the BEST answer.)

A.    Use an XML editing tool to merge the compatible changes of the package versions by
comparing the package refID fields. Upgrade the merged version.
B.     Upgrade the four package versions. Use an XML editing tool to merge the compatible
changes of the package versions by comparing the package refID fields.
C.     Use the DataSet.Merge method to merge the compatible changes of the package versions
by using the Lineage IDs. Upgrade the merged version.
D.     Upgrade the four package versions. Use SSIS Designer to visually compare the package
versions, determine the compatible changes, and copy the compatible tasks into a single
package.

Answer: B

QUESTION 157
You administer a SQL Server Analysis Services (SSAS) cube.
You plan to optimize the cube partitions by using usage-based optimization.
You need to configure the SSAS instance.
Which properties should you configure? To answer, select the appropriate properties in the dialoq box in the answer area.

wps124.tmp_thumb

Answer:

wps1438.tmp_thumb

QUESTION 158
You administer a SQL Server Reporting Services (SSRS) infrastructure.
Data alerts are provisioned.
You need to monitor the number of report data feed processing events during every automated execution.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

wps2B23.tmp_thumb

Answer:

wps3E94.tmp_thumb

QUESTION 159
You deploy a PowerPivot workbook to a PowerPivot Gallery in a Microsoft SharePoint site. Workbook data comes from two different sources: Source A and Source B.
The workbook contains five tables with a total of 20 million rows from Source A, and three small lookup tables from Source B.
Data from Source A is updated throughout the day.
Data from Source B is updated at 3:00 P.M.
You have the following requirements:
– Refresh the PowerPivot workbook with updated lookup data as soon as possible.
– Minimize load on the source systems and the SharePoint environment during business hours.
– Minimize user involvement in the data refresh process.
You enable automatic data refresh for the workbook.
You need to configure a data refresh schedule for the workbook that meets the requirements.
What should you do? (More than one answer choice may achieve the goal. Select the BEST answer.)

A.    Set the default schedule to refresh outside of business hours.
Do not manually refresh the workbook.
B.    Set the default schedule to refresh outside of business hours.
Manually refresh the workbook at 9:00 A.M. every day.
C.    Set the default schedule to refresh at 9:00 A.M. every day.
Create a separate schedule for Source A’s connection to refresh outside of business hours.
D.    Set the default schedule to refresh at 3:00 P.M. every day.
Do not create individual source schedules.
E.    Set the default schedule to refresh at 9:00 A.M. every day.
Do not create individual source schedules.

Answer: C

QUESTION 160
You are designing a reporting solution that uses SQL Server Reporting Services (SSRS) in SharePoint integrated mode.
The reporting solution must meet the following requirements:
– Allow report writers to reuse content between different reports.
– Allow report writers to modify reusable content in SharePoint.
– Retain version history for report content.
You need to choose a reporting method that meets the requirements.
What should you use? (More than one answer choice may achieve the goal. Select the BEST answer.)

A.    drillthrough reports
B.    linked reports
C.    subreports
D.    report parts

Answer: D


Braindump2go New Updated 70-467 Exa Dumps are Complete Microsoft 70-467 Course Coverage! 100% Real Questions and Correct Answers Guaranteed! Updated 70-467 Preparation Material with Questions and Answers PDF Instant Download:

1922

http://www.braindump2go.com/70-467.html